Accessibility Tools

Skip to main content

LATERAL PARKING SYSTEM COMBINED WITH SHUTTLE (LPT-SHUTTLE)

Location

Luxemburg

Parking Spaces

16

Implementation

Below Grade

Levels

4

System

LPT-Shuttle

The lateral parking system was implemented on three levels with 20 parking spaces in the concrete structure. The turntable in the transfer room enables access at an angle to the building outline and exit in the direction of travel.

stolzer Parking Systems -
Quality made by STOPA

STOPA Anlagenbau GmbH

Business Unit
stolzer Parksysteme

Industriestraße 12
77855 Achern-Gamshurst
Deutschland
T +49 7841 704-0
F +49 7841 704-190
info(at)stolzer.com

Quicklinks